Projects – Infrastructure projects
Infrastructure projects
Construction of water junctions, sewage-pumping stations and sewage-cleaning stations:
Water junction with the total capacity of 10,000 m3/day: one,
Water junctions with the total capacity of 25,000 m3/day: three,
Sewage-pumping station with the capacity of 50,000 m3/day: one,
Sewage-pumping station with the capacity of 300,000 m3/day: one.
EXPERIENCE OF INFRASTRUCTURE CONSTRUCTION INCLUDES THE FOLLOWINGS COMPLETED PROJECTS:
Construction of engineering networks, water supply and sanitation WWTP-300, WWTP-50
• Construction of water hubs
• Construction of sewage pumping stations
• Construction of sewage treatment facilities
• Construction of underwater cablings
• Construction of pedestrian underpasses



KOS-300
Wastewater treatment occurs by a combination of the mechanical method and multi-chamber anaerobic and aerobic methods. The cleaning process is controlled by a modern process control system. The output of the system is purified and disinfected water and dehydrated sludge.
KOS-50
Wastewater treatment is carried out by the method of mechanical and natural biological treatment in 4 cascade anaerobic-aerobic bioponds.





